skip to Main Content
  • Schepers J.G., Boorsma K., Cho T., Gomez-Iradi S., Schaffarczyk P., Jeromin A., Shen W.Z, Lutz T., Meister K., Stoevesandt B., Schreck S., Micallef D., Pereira R., Sant T., Madsen H.A, Sørensen, N. “Analysis of Mexico wind tunnel measurements”. Final report of IEA Task 29, Mexnext (Phase 1). February 2012, ECN (Netherlands), ECN-E–12-004.
  • Frias L, Stoffels N, Sanz RodrigoJ, von Bremen L (2012)”Statistical analysis of wind power and prediction errors for selected test areas”. Deliverable Dp7.1 of the FP7-SAFEWIND project, grant agreement number 213740, 27 pp.
  • Girard R, Laquaine G, Kariniotakis G, Sanz RodrigoJ, Frias L (2012) “Study of the economic impact of the level of predictability on selected wind farms”. Deliverable Dp7.3 of the FP7-SAFEWIND project , grant agreement number 213740, 67 pp.
  • Lársen XG, Cantero E, Sanz RodrigoJ (2012) “Determination of Vref using meteorological model outputs”. Deliverable Dp7.5 of the FP7-SAFEWIND project , grant agreement number 213740, 35 pp.
  • Sanz Rodrigo J, Borbón F, Dupont E (2012) “Classification of wind profiles in terms of shear, turbulence”, direction &extremes. Deliverable Dp2.4 of the FP7-SAFEWIND project, grant agreement number 213740, 49 pp.
  • Sanz Rodrigo J, Frias L, Cantero E, Girard R, Laquaine G, Kariniotakis G, Lársen XG, Stoffels N, von Bremen L (2012) “Wind predictability as a decision factor in the resource assessment phase”. Deliverable Dc7.7 of the FP7-SAFEWIND project, grant agreement number 213740, 19 pp.
  • Sanz Rodrigo J, Frias L, Stoffels N, von Bremen L (2012) “Guidelines on how smart consideration of meteorological aspects can promote wind power”. Deliverable Dp7.2 of the FP7-SAFEWIND project, grant agreement number 213740, 21 pp.
  • Schepers J.G., K. Boorsma, T. Cho, et al. “Analysis of Mexico wind tunnel measurements”, in: Final Report of IEA Task 29 , Mexnext (Phase 1) . ECN, ECN-E-12-004 The Netherlands, February 2012.
Back To Top